Defender™ Packer Saves Refrac Well by Isolating Competitor's Liner Top Leak
Vertice Oil Tools remains at the forefront of innovation, delivering solutions that drive operational efficiency for clients. With the patented DEFENDER™ PACKER, another South Texas operator was able to avoid costly complications caused by competitor’s liner top leak due to failed packer. This advanced frac tool ensures rapid deployment, reliable performance, and full liner top isolation—helping operators meet casing pressure test requirements with confidence.
Stay on Track, Maximize Output
Leaking Liner Top Isolated without Remedial Cement Job
The Challenge: Safeguarding Liner Top Isolation, Vertice Oil Tools Solves Pressure Test Complications
A South Texas frac operator installed a competitor’s 4” x 5 ½” refrac liner system. Following the cement job, the well failed to pass a pressure test. Despite multiple intervention attempts, diagnostics confirmed a leak at the liner top—resulting from the failure of the competitor’s liner top packer—which allowed fluid to inject down the backside of the 4” liner at approximately 3 bpm.
The severity of the leak ruled out any pumpdown wireline operations in the lateral and posed a high risk of liner top erosion during the upcoming frac. With over $1MM already invested in refrac prep and liner installation—and the frac crew scheduled to arrive imminently—the operator needed an immediate solution that didn’t involve pumping more cement.
The Solution: The Defender™ Compression Set Packer
Vertice deployed its DEFENDER™ Compression Set Packer with a crossover to the competitor’s existing 4” x 5 ½” latch seal assembly, stinging directly into the compromised liner top. This approach provided an effective seal without the need for cement squeeze job. The DEFENDER™ Packer was set using minimal slack-off weight, thanks to its low setting force requirement—removing the need for heavy-weight drill pipe.
Following deployment, the assembly passed a successful +10,000 psi pressure test. The rig was demobilized shortly after, allowing the frac crew to move in without delay. The entire operation was completed within 13 hours of Vertice arriving on location.
Refrac Confidence Starts with Proven Tools
When pressure test failures threaten your refrac schedule, Vertice Oil Tools delivers fast, effective solutions. Our DEFENDER™ Compression Set Packer helped salvage a $1MM investment by isolating a leaking liner top without the need for remedial cement. The operation was completed in just 13 hours—demonstrating the speed, reliability, and engineering precision our clients count on.
Built for unconventional challenges, the DEFENDER™ Packer ensures rapid deployment, low setting force requirements, and dependable sealing for full liner top isolation. Whether you’re dealing with last-minute complications or planning for optimized frac performance from the start, Vertice gives you the confidence to execute.